In 2012-2013 and 2015-2016, PT. Pertamina RU VI Balongan appointed us do a project of Compressor Panel Retrofit for Reliability of Utilities. In the project, we had to manage controller and instruments change of the existing air compressors to enable communication with the Central control room. Also to rectify reliability of the Plant Air Compressor (58-K-101A/B/C/.D) which serve the supply of compressed air to all areas of the refinery process operation area and supply for the process of Instrumentation (pneumatic) since it first operated in year 1994. The Scope was PLC-ASC Plant Air Compressor, Transmitters within Racks, Installation, startup, and commissioning.
in 2014, we supplied 4 units of Natural Gas Screw Compressor to PT.Petrotech Pentanusa, a subsidiary of Rukun Raharja Group, and the awarded contractor for Rental Service of Gas Production Facility at Lapangan Meruap, Sarolangun – Jambi. Within this facility, they deliver gas explored by TAC Pertamina Meruap to local state owned gas power plant (5 MW) Serumpun Pseko. Local to expand electrification coverage at the region.
In 2015, we supported PT. Timas Suplindo in cooperation with PT Odira Energi as consortium to run a project that was owned by PT. PLN Enjiniring. The project was to construct CNG Plant Bangkanai Plant, a facility that supply and process (cleaning, conditioning and gas storaging) CNG (Compressed Natural Gas) from OPHIR Gas Station to PLTMG (Pembangkit Listrik Tenaga Mesin Gas) 155 MW Bangkanai located at Karendan Village, Lahei District, North Barito Regency, Central Kalimantan.
This project was not only successfully upgraded PLTMG capacity of electricity, but also improve efficiency as CNG replacing diesel fuel.
East Halmahera Ferronickel Plant Development Project (P3FH) in East Halmahera, North Maluku, is one of PT. ANTAM (Persero) Tbk’s strategic projects. By this project, ANTAM is aiming to increase the company's ferronickel production capacity from 27,000-30,000 tons of nickel in ferronickel (TNi) per year to 40,500 - 43,500 TNi per year.
ANTAM assigned PT Wijaya Karya (Persero) Tbk (WIKA) – Kawasaki Heavy Industries, Ltd. (WIKA-KHI) as the engineering, procurement & construction (EPC) contractor of the project. We supported the EPC by supplying Air Separation Package which comprises of on-site Nitrogen PSA Generator Package and on site Oxygen PSA Generator Package.
We supported PT. Rekayasa Industri to run this strategic industrial plant to fulfill national demand of ammonium, by supply Oilfree Air COmpressor and Air Dryer.
In line with expansion of new sugar cane plants in six districts namely Demak, Kudus, Jepara, Pati, Blora, and Rembang, and continuous improvement the quality of raw materials supplied by fostered farmers, PT. Perkebunan Nusantara (PTPN) IX revitalised 177 years old Pabrik Gula (PG Rendeng). With the revitalization of PG Rendeng, the company targets to increase the capacity of the rollers. Previously 2,500-3,000 Tons of Cane per Day (TCD / ton per day) became 4,000 TCD.
We supplied instrument air compressor package.
In 2019-2021, a Consortium of PT. Rekayasa Industri, PT. JGC Indonesia, and JGC Corporation have executed construction of Gas Processing Facilities (GPF) owned by PT Pertamina EP Cepu (PEPC), a subsidiary of PT Pertamina (Persero).
The consortium awarded us to supply one package of Instrument Air Compressor for Area-1 site. What makes the package special are: All electrical and instrumentations comply with mandatory requirements of Hazardous Area Class.1 Div.2. Supplied Ex’d compliance is a special excessive specification for package local panel. We provided the mentioned specification as local modification from the principal factory original standard. In addition, air receiver tank supplied not only based on ASME Sect.VIII Div.1 standard, but also ASME U-Stamped.
In 2020-2021, PT. Barata Indonesia have executed construction of LPG Pressurized Terminal 4x 3000 MT at Belawan, North Sumatera, owned by PT. Pertamina (Persero)
We supported this project by supplying one package of Instrument Air Compressor. As it was mandatory that compressor local controller shall be PLC (Programmable Logic Control) based, we fulfilled the requirement as local modification from principal factory original standard controller.